Caledonian MacBrayne Pedestrian Walkway, Ardrossan Harbour 11                                                            29 March 2009

Construction of the pedestrian walkway between Ardrossan Harbour Station and Caledonian MacBrayne Office started on 9 February 2009 and the walkway came into use on 9 April 2009.