Caledonian MacBrayne Pedestrian Walkway, Ardrossan Harbour 4                       21 February 2009

Construction work on the pedestrian walkway between Ardrossan Harbour Station and Caledonian MacBrayne Office started on 9 February 2009 and the walkway came into use on 9 April 2009.