Caledonian MacBrayne Pedestrian Walkway, Ardrossan Harbour
9 15
March 2009
Construction of the pedestrian walkway between Ardrossan
Harbour Station and Caledonian
MacBrayne Office started on 9 February 2009 and the walkway came into use
on 9 April 2009.